BEYOND TRANSPORT

THE 186-DAY REVOLUTION

Most LNG tanks manage 30 days. We guarantee 186. Discover the engineering that turns a transport container into a long-term energy asset.

PASSIVE THERMAL MASTERY

The industry’s lowest boil-off rate. Zero active cooling required. Validated holding time of ≥186 days (vs market norm 30 days) with near-elimination of boil-off gas.

STRUCTURAL DOMINANCE

Inner vessel thickness of 9mm (vs market standard 3mm). Delivers 300% higher resistance to fatigue and thermal cycling.

HIGHER PAYLOAD

15% more LNG per shipment (~35,600 L usable) compared to competitors. This means materially higher energy per shipment.

Advanced Vacuum-Insulated Cryogenic Tank

THE VIRTUAL PIPELINE

Bypass permanent civil infrastructure. Our tanks are modular and stackable to 192,000 kg, acting as a “Virtual Pipeline” for islands and remote industry.

SECURE YOUR FLEET

Scroll to Top